In March 2012 we were employed to Install 3 new Fibre optic Cables so that the areas of the academy that were being refurbished and also knocked down could begin to give way to the construction of the new building.

We were only given two days to install the fibre optic cables and we achieved this in time and within budget.

In August 2012 we were successfully awarded the contract to supply ALL of the Audio Visual technology to the refurbished areas of the Academy and also the New building currently under construction

This includes 46 Interactive whiteboards comprising Promethean 87inch and 95inch Interactive whiteboards with the Epson EB-485w ultra short throw projector.

Each unit is controlled by an AMX Control panel in the Fixed Lecturn.

In addition to this part of the same contract was to supply and install a sound systems in both the New Multi gym and also the New Dance Studio.

During January 2013 we were employed to supply and install a New Sound system in the old main Hall incorporating 6 MT Pro speakers wired back to a control rack located in the main hall. We also were asked to install external speakers and speakers in the servery which can be individually switched on for larger audiences